ST 57 WB over ST159 MAIN ST

4.75 MI E OF SOUTHWICK · County 013, Massachusetts · Built 2002 · 3 Lanes · 16,427 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
7
Good
Superstructure
4
Poor
Substructure
7
Good

Bridge Details

Structure #
A05017AJUDOTNBI
Year Built
2002
Length
51.2 m (168 ft)
Max Span
25.5 m
Width
14.7 m (48.2 ft)
Lanes
3
Daily Traffic
16,427
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,963,000
Total Project Cost
$7,445,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.