I- 90 94 RYAN ELEV over 22ND TO SB CHI RVR
0.3 M N I-55 · County 031, Illinois · Built 1962 · 9 Lanes · 180,300 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
41.852658, -87.645381
This bridge is in worse condition than 62.9% of bridges in County 031. The average bridge in Illinois is 0 years old; this one is 64 years old.
Nearby Bridges
I- 90 94 SB TOI-55 over ARCHER BNSF & IC RR
Built 1964
I- 90 94 RYAN ELEV over S BR CHI RIVER
Built 1962
I- 55 EB TO I90 94 over CHI RIVER; CERMAK;RR
Built 1962
CERMAK RD over S BR CHICAGO RIV
Built 1906
HALSTED ST over S BR CHICAGO RIVER
Built 1934
I- 90 94 RYAN ELEV over S BR CHGO RIV TO CAN
Built 1962
I- 90 94 SB 2 I-55 over I- 55 STEVENSON
Built 1964
I- 90 94 SB TO I55 over CHI RIV &CANAL P-AVE
Built 1962
I- 90 94 RYAN ELEV over 18TH TO 22ND STS
Built 1962
I- 55 EB TO RYAN N over I- 55 STEVENSON
Built 1964
Bridge Details
- Structure #
- 016111300000000
- Year Built
- 1962
- Reconstructed
- 1989
- Length
- 303.4 m (995.4 ft)
- Max Span
- 38.2 m
- Width
- 45.1 m (148 ft)
- Lanes
- 9
- Daily Traffic
- 180,300
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $10,432,000
- Total Project Cost
- $15,648,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.