I- 90 94 SB TOI-55 over ARCHER BNSF & IC RR
0.1 M W I-94 · County 031, Illinois · Built 1964 · 2 Lanes · 35,100 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
41.850228, -87.644983
This bridge is in worse condition than 62.9% of bridges in County 031. The average bridge in Illinois is 0 years old; this one is 62 years old.
Nearby Bridges
I- 90 94 RYAN ELEV over S BR CHI RIVER
Built 1962
I- 55 EB TO I90 94 over CHI RIVER; CERMAK;RR
Built 1962
HALSTED ST over S BR CHICAGO RIVER
Built 1934
I- 90 94 RYAN ELEV over S BR CHGO RIV TO CAN
Built 1962
I- 90 94 SB 2 I-55 over I- 55 STEVENSON
Built 1964
I- 90 94 RYAN ELEV over 22ND TO SB CHI RVR
Built 1962
I- 94 SB TO I-55 W over HALSTED ST
Built 2000
I- 55 EB TO RYAN N over I- 55 STEVENSON
Built 1964
CERMAK RD over S BR CHICAGO RIV
Built 1906
I- 55 EB TO I-94 S over HALSTED ST
Built 1997
Bridge Details
- Structure #
- 016106200000000
- Year Built
- 1964
- Reconstructed
- 1990
- Length
- 179.2 m (587.9 ft)
- Max Span
- 20 m
- Width
- 10.3 m (33.8 ft)
- Lanes
- 2
- Daily Traffic
- 35,100
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,222,000
- Total Project Cost
- $1,833,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.