I- 90 94 RYAN ELEV over S BR CHI RIVER

0.2 M N I-55 · County 031, Illinois · Built 1962 · 9 Lanes · 197,300 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
016111400000000
Year Built
1962
Reconstructed
1989
Length
157.6 m (517.1 ft)
Max Span
67.1 m
Width
45.1 m (148 ft)
Lanes
9
Daily Traffic
197,300
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.