I- 90 94 RYAN ELEV over S BR CHGO RIV TO CAN
2 M S I-290 · County 031, Illinois · Built 1962 · 9 Lanes · 197,300 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
41.848983, -87.644056
This bridge is in worse condition than 62.9% of bridges in County 031. The average bridge in Illinois is 0 years old; this one is 64 years old.
Nearby Bridges
I- 90 94 SB 2 I-55 over I- 55 STEVENSON
Built 1964
I- 55 EB TO I90 94 over CHI RIVER; CERMAK;RR
Built 1962
I- 90 94 RYAN ELEV over S BR CHI RIVER
Built 1962
I- 90 94 SB TOI-55 over ARCHER BNSF & IC RR
Built 1964
I- 94 SB TO I-55 W over HALSTED ST
Built 2000
I- 55 EB TO RYAN N over I- 55 STEVENSON
Built 1964
HALSTED ST over S BR CHICAGO RIVER
Built 1934
I- 55 EB TO I-94 S over HALSTED ST
Built 1997
I- 55 EB RMP RYAN over DRY LAND
Built 1964
I- 55 WB STEVENSON over HALSTED ST
Built 1964
Bridge Details
- Structure #
- 016111500000000
- Year Built
- 1962
- Reconstructed
- 1989
- Length
- 597.9 m (1961.6 ft)
- Max Span
- 45 m
- Width
- 45.1 m (148 ft)
- Lanes
- 9
- Daily Traffic
- 197,300
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $19,128,000
- Total Project Cost
- $28,692,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.