I- 55 WB STEVENSON over HALSTED ST

0.2 M SW I94 · County 031, Illinois · Built 1964 · 5 Lanes · 66,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
016003500000000
Year Built
1964
Reconstructed
2000
Length
23.4 m (76.8 ft)
Max Span
22.6 m
Width
20.3 m (66.6 ft)
Lanes
5
Daily Traffic
66,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$803,000
Total Project Cost
$1,205,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.