I- 55 EB STEVENSON over HALSTED ST

0.2 M SW I94 · County 031, Illinois · Built 1964 · 4 Lanes · 33,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
016003400000000
Year Built
1964
Reconstructed
1999
Length
22.5 m (73.8 ft)
Max Span
21.7 m
Width
18.4 m (60.4 ft)
Lanes
4
Daily Traffic
33,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$255,000
Total Project Cost
$4,122,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.