I- 55 EB RMP RYAN over DRY LAND
AT I-94 · County 031, Illinois · Built 1964 · 1 Lanes · 23,500 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
41.846431, -87.643031
This bridge is in worse condition than 62.9% of bridges in County 031. The average bridge in Illinois is 0 years old; this one is 62 years old.
Nearby Bridges
I- 55 EB TO I-94 S over HALSTED ST
Built 1997
I- 94 SB TO I-55 W over HALSTED ST
Built 2000
I- 55 EB TO I-94 N over HALSTED ST
Built 1997
I- 55 EB TO RYAN N over I- 55 STEVENSON
Built 1964
I- 55 WB STEVENSON over HALSTED ST
Built 1964
I- 55 EB STEVENSON over HALSTED ST
Built 1964
I- 55 WB RMP RYAN over ARCHER; BNSF & IC RR
Built 1964
I- 90 94 SB 2 I-55 over I- 55 STEVENSON
Built 1964
I- 90 94 RYAN ELEV over S BR CHGO RIV TO CAN
Built 1962
I- 94 NB TO I-55 W over I- 55 STEVENSON
Built 1964
Bridge Details
- Structure #
- 016104600000000
- Year Built
- 1964
- Reconstructed
- 1997
- Length
- 495.4 m (1625.3 ft)
- Max Span
- 41.4 m
- Width
- 8.9 m (29.2 ft)
- Lanes
- 1
- Daily Traffic
- 23,500
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $633,000
- Total Project Cost
- $760,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.