I- 90 94 RYAN ELEV over 18TH TO 22ND STS

0.8 M N I-55 · County 031, Illinois · Built 1962 · 10 Lanes · 212,600 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
016111200000000
Year Built
1962
Reconstructed
1989
Length
522.4 m (1713.9 ft)
Max Span
29.3 m
Width
48.2 m (158.1 ft)
Lanes
10
Daily Traffic
212,600
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$19,498,000
Total Project Cost
$29,247,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.