I- 90 94 SB TO I55 over CHI RIV &CANAL P-AVE
1.5 M SW I-290 · County 031, Illinois · Built 1962 · 2 Lanes · 35,100 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
41.857378, -87.644483
This bridge is in worse condition than 62.9% of bridges in County 031. The average bridge in Illinois is 0 years old; this one is 64 years old.
Nearby Bridges
I- 90 94 RYAN ELEV over 18TH TO 22ND STS
Built 1962
I- 90 94 RYAN ELEV over 16TH TO 18TH STS
Built 1962
I- 90 94 RYAN ELEV over 15TH TO 16TH STS
Built 1962
CANAL ST over S BR CHICAGO RIVER
Built 1948
I- 90 94 RYAN ELEV over 22ND TO SB CHI RVR
Built 1962
CERMAK RD over S BR CHICAGO RIV
Built 1906
18TH STREET over RR. LUMBER ST & LOT
Built 1967
S CANAL ST over BNSF RR
Built 1930
I- 90 94 DAN RYAN over MAXWELL TO 15TH ST
Built 1962
18TH ST over S BR CHICAGO RIVER
Built 1967
Bridge Details
- Structure #
- 016106600000000
- Year Built
- 1962
- Reconstructed
- 1990
- Length
- 823 m (2700.1 ft)
- Max Span
- 38.4 m
- Width
- 10.7 m (35.1 ft)
- Lanes
- 2
- Daily Traffic
- 35,100
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $9,295,000
- Total Project Cost
- $13,943,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.