N 4400 E (SHELTON) over BURGESS CANAL
4.7 E. 0.6 S. RIGBY · County 051, Idaho · Built 1969 · 2 Lanes · 510 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
6
Satisfactory
Superstructure
4
Poor
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 4 | Poor |
| Substructure | 4 | Poor |
Location
43.661786, -111.824222
This bridge is in worse condition than 96.8% of bridges in County 051. The average bridge in Idaho is 0 years old; this one is 57 years old.
Nearby Bridges
4800 EAST RD over BURGESS CNL;SE.LABELLE
Built 1969
SH 48 over BURGESS CANAL
Built 1986
N 4500 E over DRY BED CANAL
Built 1970
E 300 N over DRYBED CANAL;E.GROVER BR
Built 1977
SH 48 over RUDY CANAL
Built 1986
4500 EAST over HARRISON CANAL
Built 1971
N 4300 E RD over DRY BED CANAL
Built 1974
N 4600 E over RUDY CANAL
Built 1973
N 4200 E RD over BURGESS CNL BR
Built 1969
105TH EAST RD over HARRISON CANAL
Built 1974
Bridge Details
- Structure #
- 000000000032505
- Year Built
- 1969
- Length
- 13.7 m (44.9 ft)
- Max Span
- 13.4 m
- Width
- 8.5 m (27.9 ft)
- Lanes
- 2
- Daily Traffic
- 510
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $325,000
- Total Project Cost
- $488,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.