N 4300 E RD over DRY BED CANAL

0.9 N. 3.5 E. RIGBY · County 051, Idaho · Built 1974 · 1 Lanes · 20 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000032555
Year Built
1974
Length
9.1 m (29.9 ft)
Max Span
8.8 m
Width
4.9 m (16.1 ft)
Lanes
1
Daily Traffic
20
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$236,000
Total Project Cost
$354,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.