4800 EAST RD over BURGESS CNL;SE.LABELLE
0.6 S. 3.6 E. RIGBY · County 051, Idaho · Built 1969 · 2 Lanes · 510 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
43.663864, -111.844033
This bridge is in worse condition than 20% of bridges in County 051. The average bridge in Idaho is 0 years old; this one is 57 years old.
Nearby Bridges
N 4400 E (SHELTON) over BURGESS CANAL
Built 1969
N 4200 E RD over BURGESS CNL BR
Built 1969
N 4300 E RD over DRY BED CANAL
Built 1974
STC 6709;N 4200 E over DRY BED CR;S.LABELLE BR
Built 1973
N 4100 E RD (MILO) over BURGESS CNL;SE.RIGBY BR
Built 1969
SH 48 over BURGESS CANAL
Built 1986
E 400 N over RIGBY CANAL
Built 1969
N 4500 E over DRY BED CANAL
Built 1970
E 421 N over LEWISVILLE CANAL
Built 1960
E 300 N over DRYBED CANAL;E.GROVER BR
Built 1977
Bridge Details
- Structure #
- 000000000032520
- Year Built
- 1969
- Length
- 11.3 m (37.1 ft)
- Max Span
- 11 m
- Width
- 8.5 m (27.9 ft)
- Lanes
- 2
- Daily Traffic
- 510
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $331,000
- Total Project Cost
- $497,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.