E 300 N over DRYBED CANAL;E.GROVER BR
5.6 E. RIGBY · County 051, Idaho · Built 1977 · 2 Lanes · 400 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
43.670278, -111.801075
This bridge is in worse condition than 20% of bridges in County 051. The average bridge in Idaho is 0 years old; this one is 49 years old.
Nearby Bridges
N 4500 E over DRY BED CANAL
Built 1970
SH 48 over BURGESS CANAL
Built 1986
N 4400 E (SHELTON) over BURGESS CANAL
Built 1969
N 4600 E over RUDY CANAL
Built 1973
SH 48 over RUDY CANAL
Built 1986
STC 6768;S 600 E over S. FORK SNAKE RIVER
Built 1999
STC 6768;S 600 E over S. FORK SNAKE RIVER
Built 1999
SH 48 over HARRISON CANAL
Built 1983
4500 EAST over HARRISON CANAL
Built 1971
STC 6768;4700 EAST over DRY BED CANAL
Built 1965
Bridge Details
- Structure #
- 000000000032275
- Year Built
- 1977
- Length
- 29.5 m (96.8 ft)
- Max Span
- 14.3 m
- Width
- 9.2 m (30.2 ft)
- Lanes
- 2
- Daily Traffic
- 400
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $733,000
- Total Project Cost
- $1,100,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.