N 4500 E over DRY BED CANAL

3.2 N. 1.5 W. RIRIE · County 051, Idaho · Built 1970 · 2 Lanes · 430 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000032480
Year Built
1970
Length
34.7 m (113.8 ft)
Max Span
16.9 m
Width
8.6 m (28.2 ft)
Lanes
2
Daily Traffic
430
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$644,000
Total Project Cost
$966,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.