500 NORTH RD over LONG ISLAND CANAL
0.3 S. 0.5 W. LABELLE · County 051, Idaho · Built 1966 · 2 Lanes · 1,700 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
43.699256, -111.870092
This bridge is in worse condition than 20% of bridges in County 051. The average bridge in Idaho is 0 years old; this one is 60 years old.
Nearby Bridges
STC 6709;N 4200 E over LONG ISLAND CANAL
Built 1969
550 WEST ROAD over LONG ISLAND CANAL
Built 1973
E 421 N over LEWISVILLE CANAL
Built 1960
STC 6709;N 4200 E over DRY BED CR;S.LABELLE BR
Built 1973
N 4100 E over LEWISVILLE CANAL
Built 1969
E 400 N over RIGBY CANAL
Built 1969
N YELLOWSTONE HWY over MENAN CANAL
Built 2010
N YELLOWSTONE HWY over DRY BED CANAL
Built 1999
US 20 EBL over SNAKE RIVER DRY BED CNL
Built 1975
N YELLOWSTONE HWY over DRY BED CANAL
Built 1999
Bridge Details
- Structure #
- 000000000032405
- Year Built
- 1966
- Length
- 9.1 m (29.9 ft)
- Max Span
- 8.8 m
- Width
- 8.6 m (28.2 ft)
- Lanes
- 2
- Daily Traffic
- 1,700
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $370,000
- Total Project Cost
- $555,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.