105TH EAST RD over HARRISON CANAL

0.3 N. 2.4 W. RIRIE · County 051, Idaho · Built 1974 · 2 Lanes · 90 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000032305
Year Built
1974
Length
8.5 m (27.9 ft)
Max Span
8.2 m
Width
8 m (26.2 ft)
Lanes
2
Daily Traffic
90
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.