US 129 SR 24 over HARD LABOR CREEK

3.5 MI N OF MADISON · County 211, Georgia · Built 1932 · 2 Lanes · 11,400 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000021100050
Year Built
1932
Reconstructed
1968
Length
91.4 m (299.9 ft)
Max Span
9.1 m
Width
10.6 m (34.8 ft)
Lanes
2
Daily Traffic
11,400
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,172,000
Total Project Cost
$1,758,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.