US 129 SR 24 over HARD LABOR CREEK
3.5 MI N OF MADISON · County 211, Georgia · Built 1932 · 2 Lanes · 11,400 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
33.644239, -83.448344
This bridge is in worse condition than 95.1% of bridges in County 211. The average bridge in Georgia is 0 years old; this one is 94 years old.
Nearby Bridges
US 129 SR 24 over BIG SANDY CREEK
Built 1932
SANDY CREEK ROAD over BIG SANDY CREEK
Built 2004
US 278 / SR 12 over CSX RAILROAD (279602P)
Built 1959
US 129/ SR 24 over CSX RR- NOR-SOU RR
Built 1986
BOSTWICK HIGHWAY over HARD LABOR CREEK
Built 1996
BOSTWICK HIGHWAY over MILE BRANCH
Built 1937
LOWER APALACHEE RD over HARD LABOR CREEK
Built 1978
BEAVER DAM ROAD over BEAVERDAM CREEK
Built 1994
BOSTWICK HIGHWAY over LITTLE SANDY CREEK
Built 2012
DOSTER ROAD over HARD LABOR CREEK
Built 1994
Bridge Details
- Structure #
- 000000021100050
- Year Built
- 1932
- Reconstructed
- 1968
- Length
- 91.4 m (299.9 ft)
- Max Span
- 9.1 m
- Width
- 10.6 m (34.8 ft)
- Lanes
- 2
- Daily Traffic
- 11,400
- Material
- Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,172,000
- Total Project Cost
- $1,758,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.