US 129 SR 24 over BIG SANDY CREEK

1.5 MI SW OF APALACHEE · County 211, Georgia · Built 1932 · 2 Lanes · 9,550 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000021100060
Year Built
1932
Reconstructed
1968
Length
95.7 m (314 ft)
Max Span
15.8 m
Width
10.6 m (34.8 ft)
Lanes
2
Daily Traffic
9,550
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,227,000
Total Project Cost
$1,840,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.