US 278 / SR 12 over CSX RAILROAD (279602P)
2 MI NE OF MADISON · County 211, Georgia · Built 1959 · 2 Lanes · 3,340 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
33.612708, -83.444089
This bridge is in worse condition than 95.1% of bridges in County 211. The average bridge in Georgia is 0 years old; this one is 67 years old.
Nearby Bridges
US 129/ SR 24 over CSX RR- NOR-SOU RR
Built 1986
BOSTWICK HIGHWAY over MILE BRANCH
Built 1937
BUCKHEAD ROAD over NORTH SUGAR CREEK
Built 2012
US 129 SR 24 over HARD LABOR CREEK
Built 1932
PLAINVIEW ROAD over NORTH SUGAR CREEK
Built 2000
US 129BP SR 24 BP over HORSE BRANCH
Built 1991
BOSTWICK HIGHWAY over HARD LABOR CREEK
Built 1996
LOWER APALACHEE RD over HARD LABOR CREEK
Built 1978
SANDY CREEK ROAD over BIG SANDY CREEK
Built 2004
US 129 SR 24 over BIG SANDY CREEK
Built 1932
Bridge Details
- Structure #
- 000000021100010
- Year Built
- 1959
- Length
- 77.7 m (254.9 ft)
- Max Span
- 18.3 m
- Width
- 10.5 m (34.4 ft)
- Lanes
- 2
- Daily Traffic
- 3,340
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $996,000
- Total Project Cost
- $1,495,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.