US 129/ SR 24 over CSX RR- NOR-SOU RR
1.5 MI NE OF MADISON · County 211, Georgia · Built 1986 · 4 Lanes · 11,400 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.611272, -83.449839
This bridge is in worse condition than 37.9% of bridges in County 211. The average bridge in Georgia is 0 years old; this one is 40 years old.
Nearby Bridges
US 278 / SR 12 over CSX RAILROAD (279602P)
Built 1959
BOSTWICK HIGHWAY over MILE BRANCH
Built 1937
BUCKHEAD ROAD over NORTH SUGAR CREEK
Built 2012
US 129BP SR 24 BP over HORSE BRANCH
Built 1991
US 129 SR 24 over HARD LABOR CREEK
Built 1932
PLAINVIEW ROAD over NORTH SUGAR CREEK
Built 2000
BOSTWICK HIGHWAY over HARD LABOR CREEK
Built 1996
LOWER APALACHEE RD over HARD LABOR CREEK
Built 1978
SANDY CREEK ROAD over BIG SANDY CREEK
Built 2004
US 129 SR 24 over BIG SANDY CREEK
Built 1932
Bridge Details
- Structure #
- 000000021100040
- Year Built
- 1986
- Length
- 77.1 m (253 ft)
- Max Span
- 19.5 m
- Width
- 21.7 m (71.2 ft)
- Lanes
- 4
- Daily Traffic
- 11,400
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,528,000
- Total Project Cost
- $2,292,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.