LOWER APALACHEE RD over HARD LABOR CREEK
3.6 MI SE OF APALACHEE · County 211, Georgia · Built 1978 · 2 Lanes · 40 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.640236, -83.397969
This bridge is in worse condition than 37.9% of bridges in County 211. The average bridge in Georgia is 0 years old; this one is 48 years old.
Nearby Bridges
BRIAR CREEK ROAD over BRIAR CREEK
Built 1986
SANDY CREEK ROAD over BIG SANDY CREEK
Built 2004
US 129 SR 24 over HARD LABOR CREEK
Built 1932
US 278 / SR 12 over CSX RAILROAD (279602P)
Built 1959
US 129 SR 24 over BIG SANDY CREEK
Built 1932
US 129/ SR 24 over CSX RR- NOR-SOU RR
Built 1986
US 278 SR 12 over APALACHEE RIVER
Built 1986
APALACHEE RIVER RD over GOOSE CREEK
Built 2004
BUCKHEAD ROAD over NORTH SUGAR CREEK
Built 2012
PLAINVIEW ROAD over NORTH SUGAR CREEK
Built 2000
Bridge Details
- Structure #
- 000000021150350
- Year Built
- 1978
- Length
- 109.7 m (359.9 ft)
- Max Span
- 12.2 m
- Width
- 9.7 m (31.8 ft)
- Lanes
- 2
- Daily Traffic
- 40
- Material
- Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,407,000
- Total Project Cost
- $2,110,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.