DOSTER ROAD over HARD LABOR CREEK
5.5 MI E OF RUTLEDGE · County 211, Georgia · Built 1994 · 2 Lanes · 440 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
33.630483, -83.515272
This bridge is in worse condition than 37.9% of bridges in County 211. The average bridge in Georgia is 0 years old; this one is 32 years old.
Nearby Bridges
DOUBLE BRIDGE RD over HARD LABOR CREEK
Built 1996
BOSTWICK HIGHWAY over HARD LABOR CREEK
Built 1996
SANDY CREEK ROAD over LITTLE SANDY CREEK
Built 1991
BOSTWICK HIGHWAY over MILE BRANCH
Built 1937
BOSTWICK HIGHWAY over LITTLE SANDY CREEK
Built 2012
FAMBROUGH BR ROAD over HARD LABOR CREEK
Built 1981
US 129BP SR 24 BP over HORSE BRANCH
Built 1991
I-20 WBL over BIG INDIAN CREEK TRIB
Built 1966
US 129 SR 24 over HARD LABOR CREEK
Built 1932
BROWNWOOD ROAD over I-20
Built 1968
Bridge Details
- Structure #
- 000000021150060
- Year Built
- 1994
- Length
- 48.8 m (160.1 ft)
- Max Span
- 12.2 m
- Width
- 8.3 m (27.2 ft)
- Lanes
- 2
- Daily Traffic
- 440
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $625,000
- Total Project Cost
- $938,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.