DOSTER ROAD over HARD LABOR CREEK

5.5 MI E OF RUTLEDGE · County 211, Georgia · Built 1994 · 2 Lanes · 440 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000021150060
Year Built
1994
Length
48.8 m (160.1 ft)
Max Span
12.2 m
Width
8.3 m (27.2 ft)
Lanes
2
Daily Traffic
440
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$625,000
Total Project Cost
$938,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.