WELCOME ALL ROAD over SOUTH FULTON PKWY

2.1 MILES NORTH OF UNION · County 121, Georgia · Built 1990 · 2 Lanes · 5,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000012152420
Year Built
1990
Length
75.6 m (248 ft)
Max Span
25 m
Width
12.9 m (42.3 ft)
Lanes
2
Daily Traffic
5,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$969,000
Total Project Cost
$1,453,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.