BUFFINGTON ROAD over SR 14 SPUR
4 M NET OF UNION CITY · County 121, Georgia · Built 1959 · 2 Lanes · 12,200 vehicles/day
Overall
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.6149, -84.500228
This bridge is in worse condition than 89.8% of bridges in County 121. The average bridge in Georgia is 0 years old; this one is 67 years old.
Nearby Bridges
I-85R N TO SR14P W over SR 14P & 2- I-285 RAMPS
Built 1987
OLD NATIONAL HWY. over SR 14- CSX RAILROAD
Built 1967
US 29 over SR 14 SPUR
Built 1961
I-285R TO I-85 SBL over SR 14 SPUR- SR 14 RAMP
Built 1985
I-85R N TO SR14P W over I-85- I-85 RMP- I-285 R
Built 1987
I-285 CCBL over I-85-SR 14P-I-85R-I-285R
Built 1988
R- I-85 N TO I-285 over I-85- I-85 RAMP
Built 1984
I-285 R TO I-85 over SR 14- CSX RAILROAD
Built 1984
I-285 over SR 14 (US 29)- CSX RR
Built 1966
I-85 RAMP NBL over I-85 SB RAMP TO I-285 NB
Built 1984
Bridge Details
- Structure #
- 000000012103650
- Year Built
- 1959
- Length
- 65.8 m (215.9 ft)
- Max Span
- 18 m
- Width
- 11.9 m (39 ft)
- Lanes
- 2
- Daily Traffic
- 12,200
- Material
- Concrete Continuous
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $844,000
- Total Project Cost
- $1,266,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.