R- I-85 N TO I-285 over I-85- I-85 RAMP
2 MI SW OF COLLAGE PARK · County 121, Georgia · Built 1984 · 2 Lanes · 35,000 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.616392, -84.485183
This bridge is in worse condition than 15.6% of bridges in County 121. The average bridge in Georgia is 0 years old; this one is 42 years old.
Nearby Bridges
I-285 CCBL over I-85-SR 14P-I-85R-I-285R
Built 1988
I-85 RAMP NBL over I-85 SB RAMP TO I-285 NB
Built 1984
I-85R N TO SR14P W over I-85- I-85 RMP- I-285 R
Built 1987
SR 14 SPUR E Y-BR over I-85- I-85 RMP- I285 RMP
Built 1987
I-285 RAMP TO I-85 over I-85
Built 1985
I-285R TO I-85 SBL over SR 14 SPUR- SR 14 RAMP
Built 1985
I-85 RAMP TO I-285 over I-85 RAMP NBL TO SR 279
Built 1986
I-285 CBL over SR 14 SPUR WBL
Built 1987
I-85R N TO SR14P W over SR 14P & 2- I-285 RAMPS
Built 1987
I-85R N TO I-285CB over SR 14 (US 29)- CSX RR.
Built 1983
Bridge Details
- Structure #
- 000000012102150
- Year Built
- 1984
- Length
- 153 m (502 ft)
- Max Span
- 39.6 m
- Width
- 13.8 m (45.3 ft)
- Lanes
- 2
- Daily Traffic
- 35,000
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,961,000
- Total Project Cost
- $2,942,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.