US 29 over SR 14 SPUR
3.5 MI NE OF UNION CITY · County 121, Georgia · Built 1961 · 6 Lanes · 26,900 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.616806, -84.513003
This bridge is in worse condition than 15.6% of bridges in County 121. The average bridge in Georgia is 0 years old; this one is 65 years old.
Nearby Bridges
OLD NATIONAL HWY. over SR 14- CSX RAILROAD
Built 1967
WELCOME ALL ROAD over SOUTH FULTON PKWY
Built 1990
BUFFINGTON ROAD over SR 14 SPUR
Built 1959
US 29/SR14 ALT EB over CSX RAILROAD
Built 1991
US29/SR14ALT WBL over CSX RAILROAD
Built 1991
US 29/ SR 14 over CSX RAILROAD
Built 1938
STACKS ROAD over CSX RAILROAD (638609E)
Built 1964
MALLORY ROAD over CSX RAILROAD (638608X)
Built 1963
I-85R N TO SR14P W over SR 14P & 2- I-285 RAMPS
Built 1987
WELCOME ALL ROAD over CSX RAILROAD
Built 1974
Bridge Details
- Structure #
- 000000012100430
- Year Built
- 1961
- Reconstructed
- 1991
- Length
- 82.6 m (271 ft)
- Max Span
- 23.2 m
- Width
- 28.3 m (92.8 ft)
- Lanes
- 6
- Daily Traffic
- 26,900
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,214,000
- Total Project Cost
- $3,321,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.