US29/SR14ALT WBL over CSX RAILROAD
3 MILES NORTHWEST OF UNIO · County 121, Georgia · Built 1991 · 2 Lanes · 22,200 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
33.619044, -84.528647
This bridge is in worse condition than 15.6% of bridges in County 121. The average bridge in Georgia is 0 years old; this one is 35 years old.
Nearby Bridges
US 29/SR14 ALT EB over CSX RAILROAD
Built 1991
WELCOME ALL ROAD over SOUTH FULTON PKWY
Built 1990
US 29/ SR 14 over CSX RAILROAD
Built 1938
STACKS ROAD over CSX RAILROAD (638609E)
Built 1964
WELCOME ALL ROAD over CSX RAILROAD
Built 1974
US 29 over SR 14 SPUR
Built 1961
OLD NATIONAL HWY. over SR 14- CSX RAILROAD
Built 1967
MALLORY ROAD over CSX RAILROAD (638608X)
Built 1963
US 29/SR 14 ALT over WOLF CREEK TRIB.
Built 1991
SCARBROUGH ROAD over WOLF CREEK
Built 1963
Bridge Details
- Structure #
- 000000012152560
- Year Built
- 1991
- Length
- 56.1 m (184.1 ft)
- Max Span
- 26.8 m
- Width
- 12.6 m (41.3 ft)
- Lanes
- 2
- Daily Traffic
- 22,200
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $719,000
- Total Project Cost
- $1,078,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.