US 29/SR14 ALT EB over CSX RAILROAD
3 MILES NORTHWEST OF UNIO · County 121, Georgia · Built 1991 · 2 Lanes · 41,000 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
33.61885, -84.52855
This bridge is in worse condition than 15.6% of bridges in County 121. The average bridge in Georgia is 0 years old; this one is 35 years old.
Nearby Bridges
US29/SR14ALT WBL over CSX RAILROAD
Built 1991
WELCOME ALL ROAD over SOUTH FULTON PKWY
Built 1990
US 29/ SR 14 over CSX RAILROAD
Built 1938
STACKS ROAD over CSX RAILROAD (638609E)
Built 1964
WELCOME ALL ROAD over CSX RAILROAD
Built 1974
OLD NATIONAL HWY. over SR 14- CSX RAILROAD
Built 1967
US 29 over SR 14 SPUR
Built 1961
MALLORY ROAD over CSX RAILROAD (638608X)
Built 1963
US 29/SR 14 ALT over WOLF CREEK TRIB.
Built 1991
SCARBROUGH ROAD over WOLF CREEK
Built 1963
Bridge Details
- Structure #
- 000000012152550
- Year Built
- 1991
- Length
- 56.1 m (184.1 ft)
- Max Span
- 26.8 m
- Width
- 12.6 m (41.3 ft)
- Lanes
- 2
- Daily Traffic
- 41,000
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $719,000
- Total Project Cost
- $1,078,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.