MALLORY ROAD over CSX RAILROAD (638608X)

2 MI NE OF UNION CITY · County 121, Georgia · Built 1963 · 2 Lanes · 5,120 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000012150760
Year Built
1963
Length
27.4 m (89.9 ft)
Max Span
9.1 m
Width
7.4 m (24.3 ft)
Lanes
2
Daily Traffic
5,120
Material
Prestressed Concrete
Design
Channel Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$352,000
Total Project Cost
$527,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.