MALLORY ROAD over CSX RAILROAD (638608X)
2 MI NE OF UNION CITY · County 121, Georgia · Built 1963 · 2 Lanes · 5,120 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
33.604172, -84.528678
This bridge is in worse condition than 67.7% of bridges in County 121. The average bridge in Georgia is 0 years old; this one is 63 years old.
Nearby Bridges
STACKS ROAD over CSX RAILROAD (638609E)
Built 1964
US 29/ SR 14 over CSX RAILROAD
Built 1938
WELCOME ALL ROAD over SOUTH FULTON PKWY
Built 1990
US 29/SR14 ALT EB over CSX RAILROAD
Built 1991
US29/SR14ALT WBL over CSX RAILROAD
Built 1991
FLAT SHOALS ROAD over MORNING CREEK TRIB
Built 1972
US 29 over SR 14 SPUR
Built 1961
OLD NATIONAL HWY. over SR 14- CSX RAILROAD
Built 1967
US 29/SR 14 ALT over WOLF CREEK TRIB.
Built 1991
FLAT SHOALS ROAD over I-85
Built 1964
Bridge Details
- Structure #
- 000000012150760
- Year Built
- 1963
- Length
- 27.4 m (89.9 ft)
- Max Span
- 9.1 m
- Width
- 7.4 m (24.3 ft)
- Lanes
- 2
- Daily Traffic
- 5,120
- Material
- Prestressed Concrete
- Design
- Channel Beam
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $352,000
- Total Project Cost
- $527,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.