GARSON DRIVE over MARTA

IN BUCKHEAD · County 121, Georgia · Built 1984 · 2 Lanes · 2,047 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000012152030
Year Built
1984
Length
26.2 m (86 ft)
Max Span
26.2 m
Width
16.8 m (55.1 ft)
Lanes
2
Daily Traffic
2,047
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$336,000
Total Project Cost
$504,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.