LINDBERGH ROAD over MARTA

IN BUCKHEAD · County 121, Georgia · Built 1984 · 5 Lanes · 11,700 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000012106060
Year Built
1984
Length
26.2 m (86 ft)
Max Span
18 m
Width
34.7 m (113.8 ft)
Lanes
5
Daily Traffic
11,700
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$611,000
Total Project Cost
$916,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.