I-85 SBL over PEACHTREE CREEK

IN N ATLANTA · County 121, Georgia · Built 1984 · 6 Lanes · 192,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000012105520
Year Built
1984
Reconstructed
1993
Length
82.9 m (272 ft)
Max Span
33.5 m
Width
33.1 m (108.6 ft)
Lanes
6
Daily Traffic
192,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,222,000
Total Project Cost
$3,333,000