I-85 NBL over SR 236 LINDBERGH DRIVE

IN N ATLANTA · County 121, Georgia · Built 1984 · 5 Lanes · 151,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000012105550
Year Built
1984
Length
60.4 m (198.2 ft)
Max Span
36 m
Width
24.3 m (79.7 ft)
Lanes
5
Daily Traffic
151,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,196,000
Total Project Cost
$1,793,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.