SR 400 (NBL) over I-85

IN N ATLANTA · County 121, Georgia · Built 1993 · 2 Lanes · 83,800 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000012107350
Year Built
1993
Length
556.3 m (1825.1 ft)
Max Span
85.3 m
Width
15.6 m (51.2 ft)
Lanes
2
Daily Traffic
83,800
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$7,131,000
Total Project Cost
$10,696,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.