I-85 over SR 13

IN N ATLANTA · County 121, Georgia · Built 1984 · 12 Lanes · 151,000 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000012105560
Year Built
1984
Length
31.7 m (104 ft)
Max Span
15.8 m
Width
55 m (180.4 ft)
Lanes
12
Daily Traffic
151,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,515,000
Total Project Cost
$2,272,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.