I-85 RAMP TO 400 N over BUFORD HIGHWAY

IN NORTH ATLANTA · County 121, Georgia · Built 2014 · 2 Lanes · 13,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000012153550
Year Built
2014
Length
70.7 m (232 ft)
Max Span
41.8 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
13,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$20,602,000
Total Project Cost
$30,902,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.