I-85 over M-9213- PEACHTREE CREEK

IN N ATLANTA · County 121, Georgia · Built 1984 · 13 Lanes · 151,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000012102130
Year Built
1984
Reconstructed
2014
Length
358.7 m (1176.8 ft)
Max Span
36 m
Width
52.7 m (172.9 ft)
Lanes
13
Daily Traffic
151,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$18,395,000
Total Project Cost
$27,593,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.