SR 13 over PEACHTREE CREEK

IN N ATLANTA · County 121, Georgia · Built 1984 · 5 Lanes · 88,400 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000012102100
Year Built
1984
Length
78.3 m (256.9 ft)
Max Span
33.5 m
Width
36 m (118.1 ft)
Lanes
5
Daily Traffic
88,400
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,826,000
Total Project Cost
$2,739,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.