I-85 NBL over PEACHTREE CREEK

IN N ATLANTA · County 121, Georgia · Built 1984 · 5 Lanes · 209,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000012105530
Year Built
1984
Length
82.9 m (272 ft)
Max Span
33.8 m
Width
24.3 m (79.7 ft)
Lanes
5
Daily Traffic
209,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,932,000
Total Project Cost
$2,898,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.