I-75R TO PIED/HARR over I-75 SBL- I-75 RAMP
IN ATLANTA · County 121, Georgia · Built 1989 · 2 Lanes · 1,160 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.759853, -84.379053
This bridge is in worse condition than 15.6% of bridges in County 121. The average bridge in Georgia is 0 years old; this one is 37 years old.
Nearby Bridges
SR10R WBL TO M9155 over I-75 + 3 I-75 RAMPS
Built 1988
SR10R WBL TO I75 S over I-75 + 3 I-75 RMP -SR 10
Built 1988
I-75 (SBL) TO SR 1 over I-75 + 2 I-75 RAMPS
Built 1988
SR 10 (EBL) BR 7E over I-75- HOV & RAMP
Built 1988
I-75 R TO I-75 SB over I-75 SB RMP TO JESSIE HI
Built 1988
I-75R N TO SR 10 over M-9157 IRWIN ST- I-75R
Built 1988
I-75 over M-9157 IRWIN STREET
Built 1988
BAKER STREET over I-75 + I-75 RAMP
Built 1987
JACKSON STREET over SR 10
Built 1963
I-75 over M9184 EDWD- M9150 AUBU
Built 1988
Bridge Details
- Structure #
- 000000012107220
- Year Built
- 1989
- Length
- 124.4 m (408.1 ft)
- Max Span
- 63.4 m
- Width
- 20 m (65.6 ft)
- Lanes
- 2
- Daily Traffic
- 1,160
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Single or Spread
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,594,000
- Total Project Cost
- $2,391,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.