I-75R TO PIED/HARR over I-75 SBL- I-75 RAMP

IN ATLANTA · County 121, Georgia · Built 1989 · 2 Lanes · 1,160 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000012107220
Year Built
1989
Length
124.4 m (408.1 ft)
Max Span
63.4 m
Width
20 m (65.6 ft)
Lanes
2
Daily Traffic
1,160
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,594,000
Total Project Cost
$2,391,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.