I-75 R TO I-75 SB over I-75 SB RMP TO JESSIE HI

IN ATLANTA · County 121, Georgia · Built 1988 · 1 Lanes · 9,200 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000012107180
Year Built
1988
Length
33.8 m (110.9 ft)
Max Span
33.8 m
Width
10.1 m (33.1 ft)
Lanes
1
Daily Traffic
9,200
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$315,000
Total Project Cost
$473,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.