I-75R N TO SR 10 over M-9157 IRWIN ST- I-75R
IN ATLANTA · County 121, Georgia · Built 1988 · 2 Lanes · 14,900 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.758328, -84.378081
This bridge is in worse condition than 15.6% of bridges in County 121. The average bridge in Georgia is 0 years old; this one is 38 years old.
Nearby Bridges
I-75 over M-9157 IRWIN STREET
Built 1988
SR 10 (EBL) BR 7E over I-75- HOV & RAMP
Built 1988
I-75 (SBL) TO SR 1 over I-75 + 2 I-75 RAMPS
Built 1988
I-75 R TO I-75 SB over I-75 SB RMP TO JESSIE HI
Built 1988
I-75R TO PIED/HARR over I-75 SBL- I-75 RAMP
Built 1989
SR10R WBL TO M9155 over I-75 + 3 I-75 RAMPS
Built 1988
SR10R WBL TO I75 S over I-75 + 3 I-75 RMP -SR 10
Built 1988
JACKSON STREET over SR 10
Built 1963
I-75 over M9184 EDWD- M9150 AUBU
Built 1988
BAKER STREET over I-75 + I-75 RAMP
Built 1987
Bridge Details
- Structure #
- 000000012107160
- Year Built
- 1988
- Length
- 112.8 m (370.1 ft)
- Max Span
- 35.1 m
- Width
- 13.8 m (45.3 ft)
- Lanes
- 2
- Daily Traffic
- 14,900
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,446,000
- Total Project Cost
- $2,168,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.