SR10R WBL TO I75 S over I-75 + 3 I-75 RMP -SR 10

IN ATLANTA · County 121, Georgia · Built 1988 · 2 Lanes · 13,100 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000012107170
Year Built
1988
Length
388.6 m (1274.9 ft)
Max Span
67.1 m
Width
13.8 m (45.3 ft)
Lanes
2
Daily Traffic
13,100
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,982,000
Total Project Cost
$7,473,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.