I-75 over M9184 EDWD- M9150 AUBU

IN ATLANTA · County 121, Georgia · Built 1988 · 14 Lanes · 339,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000012106620
Year Built
1988
Length
163.1 m (535.1 ft)
Max Span
36.9 m
Width
68.6 m (225.1 ft)
Lanes
14
Daily Traffic
339,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$8,932,000
Total Project Cost
$13,397,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.