CAMP CREEK PWAY over I-285 (SR 407)

IN EAST POINT · County 121, Georgia · Built 1966 · 5 Lanes · 33,240 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000012104660
Year Built
1966
Reconstructed
2020
Length
72.2 m (236.9 ft)
Max Span
21.3 m
Width
29 m (95.1 ft)
Lanes
5
Daily Traffic
33,240
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.