I-285 over M-9056 N CAMP CREEK PKY

IN S W ATLANTA · County 121, Georgia · Built 1966 · 8 Lanes · 146,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000012102240
Year Built
1966
Reconstructed
1981
Length
39.9 m (130.9 ft)
Max Span
20.4 m
Width
41.5 m (136.2 ft)
Lanes
8
Daily Traffic
146,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.