WASHINGTON ROAD over CAMP CREEK

IN EAST POINT · County 121, Georgia · Built 1987 · 5 Lanes · 11,100 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000012103680
Year Built
1987
Length
32 m (105 ft)
Max Span
10.7 m
Width
23.9 m (78.4 ft)
Lanes
5
Daily Traffic
11,100
Material
Concrete
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$746,000
Total Project Cost
$1,119,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.