NORTH COMMERCE DRI over CAMP CREEK

IN EASTPOINT CITY LIMITS · County 121, Georgia · Built 2004 · 2 Lanes · 2,047 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000012153230
Year Built
2004
Length
137.2 m (450.1 ft)
Max Span
61 m
Width
22.9 m (75.1 ft)
Lanes
2
Daily Traffic
2,047
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$1,758,000
Total Project Cost
$2,637,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.