I-285 over SOUTH FORK CAMP CREEK

IN EAST POINT · County 121, Georgia · Built 1966 · 10 Lanes · 147,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000012102230
Year Built
1966
Reconstructed
1981
Length
42.7 m (140.1 ft)
Max Span
8.5 m
Width
45.7 m (149.9 ft)
Lanes
10
Daily Traffic
147,000
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.